# Topic Questions: 4.3 Algorithm for finding the critical path. Earliest and latest event times. Earliest and latest start and finish times for activities. — WDM11 Critical path analysis

> 41 WDM11 Critical path analysis topic questions (98 marks) on 4.3 Algorithm for finding the critical path.… — 16 papers, 2019–2026. Open the exact question…

- Canonical HTML: https://www.examsci.com/topics/edexcel-ial/mathematics/decision-mathematics-1-wdm11/critical-path-analysis/4-3-algorithm-for-finding-the-critical-path-earliest-and-latest-event-times-earliest/
- Markdown mirror: https://www.examsci.com/topics/edexcel-ial/mathematics/decision-mathematics-1-wdm11/critical-path-analysis/4-3-algorithm-for-finding-the-critical-path-earliest-and-latest-event-times-earliest/index.md

---

Edexcel IAL · Mathematics · WDM11 · Critical path analysis

41 WDM11 Critical path analysis topic questions are tagged to this syllabus point across 16 papers (2019–2026). Only the parts whose knowledge graph matches this syllabus statement are counted, and the table shows which parts of each question are involved.

- 41 topic questions
- 16 papers
- 98 tagged marks
- 41.8% of topic questions
- 36.0% of topic marks
- 2019–2026
- Syllabus 2018–current
- [All WDM11 Critical path analysis topic questions](https://www.examsci.com/topics/edexcel-ial/mathematics/decision-mathematics-1-wdm11/critical-path-analysis/)
- [All paper codes](https://www.examsci.com/topics/)

Core finding

**This Critical path analysis syllabus point appears in 16 WDM11 papers across 2019–2026, contributing 41 topic questions and 98 marks.** The most recent appearance is WDM11/01 January 2026. That equals 41.8% of the 98 topic questions and 36.0% of the 272 marks tagged to Critical path analysis. Only parts tagged to this subtopic are counted, so a four-part question can contribute one item and one part's marks. The table lists every matching question, its tagged parts and marks, with a link back to the paper page. Sessions are newest first, so the statement can be traced back through the full paper history.

## Topic questions by session

Newest sessions first. Parts and marks count only the parts tagged to this subtopic; “x of y parts” shows how much of the question is tagged elsewhere. Select the paper cell to open the matching question on the paper page, or use **Go to Practice Hub** to answer that exact question in the Interactive Practice Hub.

| Paper | Question | Type | Parts | Marks | Difficulty | Practice |
| --- | --- | --- | --- | --- | --- | --- |
| [**WDM11/01** January 2026 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2026-january-wdm11-01/#q-7) | **Q7** Critical Path Analysis - Edexcel IAL D1 Jan 2026 Q7 | FRQ | 2 of 5 parts ((b), (c)) | 5 of 14 on the paper | Easy | [Go to Practice Hub](https://www.examsci.com/practice?set_id=fbdffc15-80a9-4ef6-a258-70b2de564454&question_id=30628162-4109-4362-920d-ece95d8e5b6c&source_detail=WDM11%2F01+January+2026) |
| [**WDM11/02** January 2026 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2026-january-wdm11-02/#q-6) | **Q6** Critical Path Analysis and Gantt Charts - Edexcel IAL D1 Jan 2026 Q6 | FRQ | 2 of 5 parts ((a), (b)) | 5 of 14 on the paper | Easy | [Go to Practice Hub](https://www.examsci.com/practice?set_id=920b7e07-f16f-4268-9cc4-a78b8d69695b&question_id=8720530a-5f6d-4a22-afb2-2e537aa9e523&source_detail=WDM11%2F02+January+2026) |
| [**WDM11/01** June 2025 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2025-june-wdm11-01/#q-7) | **Q7** Critical Path Analysis - Edexcel IAL D1 2025 Q7 | FRQ | 1 of 5 parts ((b)) | 4 of 16 on the paper | Easy | [Go to Practice Hub](https://www.examsci.com/practice?set_id=f36eb865-2514-4425-97dd-557be92cdc53&question_id=d48ebaa3-6245-41e2-a35e-f0fbe5fde900&source_detail=WDM11%2F01+June+2025) |
| [**WDM11/01** January 2025 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2025-january-wdm11-01/#q-4) | **Q4** Activity Networks - Edexcel IAL D1 2025 Jan Q4 | FRQ | 1 of 2 parts ((b)) | 1 of 6 on the paper | Medium | [Go to Practice Hub](https://www.examsci.com/practice?set_id=0bc76cc1-87ae-43ea-a146-57a7a6dba481&question_id=60616cca-c5a8-4239-a383-97dc037f0d47&source_detail=WDM11%2F01+January+2025) |
| [**WDM11/01** January 2025 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2025-january-wdm11-01/#q-7) | **Q7** Critical Path Analysis - Edexcel IAL D1 2025 Jan Q7 | FRQ | 2 of 6 parts ((b), (c)) | 5 of 14 on the paper | Medium | [Go to Practice Hub](https://www.examsci.com/practice?set_id=0bc76cc1-87ae-43ea-a146-57a7a6dba481&question_id=0c05cd24-7828-47d7-a9de-6e5088b41470&source_detail=WDM11%2F01+January+2025) |
| [**WDM11/01** June 2024 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2024-june-wdm11-01/#q-2) | **Q2** Critical Path Analysis - Edexcel IAL D1 2024 Q2 | FRQ | 2 of 4 parts ((a)(i), (a)(ii)) | 5 of 10 on the paper | Easy | [Go to Practice Hub](https://www.examsci.com/practice?set_id=5f0aa5fd-c7bb-4e39-81fd-cbd20af9b1d9&question_id=99f1a3cc-b897-4480-8238-9964b94d06f0&source_detail=WDM11%2F01+June+2024) |
| [**WDM11/01** June 2024 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2024-june-wdm11-01/#q-6) | **Q6** Activity Networks and Scheduling - Edexcel IAL D1 2024 Q6 | FRQ | 1 of 4 parts ((b)) | 1 of 10 on the paper | Medium | [Go to Practice Hub](https://www.examsci.com/practice?set_id=5f0aa5fd-c7bb-4e39-81fd-cbd20af9b1d9&question_id=cfe5afc1-4701-441f-88cf-46b6cec0a248&source_detail=WDM11%2F01+June+2024) |
| [**WDM11/01** January 2024 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2024-january-wdm11-01/#q-1) | **Q1** Critical Path Analysis - Edexcel IAL D1 Jan 2024 Q1 | FRQ | 1 of 5 parts ((a)) | 4 of 13 on the paper | Easy | [Go to Practice Hub](https://www.examsci.com/practice?set_id=04198801-9090-4180-bd96-a7429907030c&question_id=9804e33f-38ff-42ab-8482-8ca4feabbae6&source_detail=WDM11%2F01+January+2024) |
| [**WDM11/01** January 2024 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2024-january-wdm11-01/#q-4) | **Q4** Activity Networks - Edexcel IAL D1 Jan 2024 Q4 | FRQ | 1 of 2 parts ((b)) | 2 of 7 on the paper | Medium | [Go to Practice Hub](https://www.examsci.com/practice?set_id=04198801-9090-4180-bd96-a7429907030c&question_id=d41f96a3-150c-4eb7-9e45-aeb4829c1165&source_detail=WDM11%2F01+January+2024) |
| [**WDM11/01** June 2023 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2023-june-wdm11-01/#q-1) | **Q1** Project Activity Network - Edexcel IAL D1 June 2023 Q1 | FRQ | 1 of 4 parts ((a)) | 4 of 10 on the paper | Easy | [Go to Practice Hub](https://www.examsci.com/practice?set_id=a8b13420-afbe-4042-b169-c5d00a5ed804&question_id=356d64b0-12d7-4546-8297-8c3b823a1b83&source_detail=WDM11%2F01+June+2023) |
| [**WDM11/01** June 2023 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2023-june-wdm11-01/#q-5) | **Q5** Activity Network Drawing and Critical Path - Edexcel IAL D1 June 2023 Q5 | FRQ | 1 of 2 parts ((b)) | 2 of 7 on the paper | Medium | [Go to Practice Hub](https://www.examsci.com/practice?set_id=a8b13420-afbe-4042-b169-c5d00a5ed804&question_id=1ffb617b-d493-44b8-a851-03e1659ca073&source_detail=WDM11%2F01+June+2023) |
| [**WDM11/01** January 2023 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2023-january-wdm11-01/#q-4) | **Q4** Critical Path Analysis - Edexcel IAL Decision Mathematics D1 Jan 2023 Q4 | FRQ | 2 of 6 parts ((b), (c)) | 5 of 13 on the paper | Easy | [Go to Practice Hub](https://www.examsci.com/practice?set_id=3c02abf8-e17d-4306-b90f-31e5e88bee92&question_id=ee082474-def4-4189-be13-730ac1e4e4ad&source_detail=WDM11%2F01+January+2023) |
| [**WDM11/01** June 2022 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2022-june-wdm11-01/#q-2) | **Q2** Critical Path Analysis - Edexcel IAL D1 June 2022 Q2 | FRQ | 2 of 3 parts ((a), (b)) | 5 of 11 on the paper | Medium | [Go to Practice Hub](https://www.examsci.com/practice?set_id=6d2516b9-e244-468a-b2b6-b68d2e2732b5&question_id=fd8a1697-1da5-496a-84fc-d6b6882a4f75&source_detail=WDM11%2F01+June+2022) |
| [**WDM11/01** June 2022 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2022-june-wdm11-01/#q-5) | **Q5** Activity Networks & Scheduling - Edexcel IAL D1 June 2022 Q5 | FRQ | 2 of 4 parts ((b)(i), (b)(ii)) | 2 of 9 on the paper | Easy | [Go to Practice Hub](https://www.examsci.com/practice?set_id=6d2516b9-e244-468a-b2b6-b68d2e2732b5&question_id=404be42b-62a7-4874-a010-9d07cb738ced&source_detail=WDM11%2F01+June+2022) |
| [**WDM11/01** January 2022 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2022-january-wdm11-01/#q-4) | **Q4** Critical Path Analysis and Cascade Charts - Edexcel IAL D1 Jan 2022 Q4 | FRQ | 1 of 3 parts ((a)) | 4 of 10 on the paper | Medium | [Go to Practice Hub](https://www.examsci.com/practice?set_id=b43cff04-c4b6-4b09-88d8-716f728cfe81&question_id=982aefe6-42c9-4184-b770-f4c83fe4f720&source_detail=WDM11%2F01+January+2022) |
| [**WDM11/01** October 2021 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2021-october-wdm11-01/#q-4) | **Q4** Critical path analysis - Edexcel IAL D1 October 2021 Q4 | FRQ | 2 of 5 parts ((b), (e)) | 5 of 11 on the paper | Medium | [Go to Practice Hub](https://www.examsci.com/practice?set_id=3b72b234-d813-43f7-ab5b-d39a65544d8e&question_id=b74e9afc-224f-4b40-9112-9e0748944006&source_detail=WDM11%2F01+October+2021) |
| [**WDM11/01** June 2021 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2021-june-wdm11-01/#q-2) | **Q2** Critical Path Analysis - Edexcel IAL Decision Mathematics D1 June 2021 Q2 | FRQ | 1 of 3 parts ((a)) | 4 of 10 on the paper | Medium | [Go to Practice Hub](https://www.examsci.com/practice?set_id=bec64d2e-ca11-4613-8f1c-8f729d5c455c&question_id=00577860-f7bb-4d2f-b259-2b89ac8b8933&source_detail=WDM11%2F01+June+2021) |
| [**WDM11/01** June 2021 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2021-june-wdm11-01/#q-6) | **Q6** Activity Networks - Edexcel IAL Decision Mathematics D1 June 2021 Q6 | FRQ | 2 of 3 parts ((b), (c)) | 4 of 9 on the paper | Hard | [Go to Practice Hub](https://www.examsci.com/practice?set_id=bec64d2e-ca11-4613-8f1c-8f729d5c455c&question_id=a7a33ec0-c2cf-423e-a112-134976e55f6e&source_detail=WDM11%2F01+June+2021) |
| [**WDM11/01** January 2021 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2021-january-wdm11-01/#q-6) | **Q6** Critical Path Analysis - Edexcel IAL D1 2021 Jan Q6 | FRQ | 2 of 5 parts ((b), (c)) | 5 of 13 on the paper | Medium | [Go to Practice Hub](https://www.examsci.com/practice?set_id=363e19a8-8c35-4a93-9d87-88a35378536f&question_id=e43877ed-aae1-4e6c-b2b0-086560cd5e49&source_detail=WDM11%2F01+January+2021) |
| [**WDM11/01** October 2020 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2020-october-wdm11-01/#q-4) | **Q4** Critical path analysis - Edexcel IAL D1 2020 Jun Q4 | FRQ | 2 of 3 parts ((b), (c)) | 2 of 7 on the paper | Medium | [Go to Practice Hub](https://www.examsci.com/practice?set_id=c25b7eef-6a17-4099-ae04-28b44359a5bf&question_id=87cba8ea-73cd-4dae-8835-584b9602e521&source_detail=WDM11%2F01+October+2020) |
| [**WDM11/01** October 2020 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2020-october-wdm11-01/#q-5) | **Q5** Critical path analysis - Edexcel IAL D1 2020 Jun Q5 | FRQ | 2 of 4 parts ((a), (d)) | 6 of 12 on the paper | Easy | [Go to Practice Hub](https://www.examsci.com/practice?set_id=c25b7eef-6a17-4099-ae04-28b44359a5bf&question_id=5200ad1e-c764-4aff-b7a7-dc401b14682f&source_detail=WDM11%2F01+October+2020) |
| [**WDM11/01** January 2020 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2020-january-wdm11-01/#q-3) | **Q3** Critical path analysis - Edexcel IAL D1 2020 Jan Q3 | FRQ | 1 of 3 parts ((a)) | 3 of 9 on the paper | Medium | [Go to Practice Hub](https://www.examsci.com/practice?set_id=e10d26ce-a57a-4414-85a8-df4e5d25bcd9&question_id=ebbbbd7c-1096-4cbe-8220-636dd8747b19&source_detail=WDM11%2F01+January+2020) |
| [**WDM11/01** January 2020 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2020-january-wdm11-01/#q-5) | **Q5** Critical path analysis - Edexcel IAL D1 2020 Jan Q5 | FRQ | 1 of 2 parts ((b)) | 2 of 7 on the paper | Hard | [Go to Practice Hub](https://www.examsci.com/practice?set_id=e10d26ce-a57a-4414-85a8-df4e5d25bcd9&question_id=9f508cff-c135-4e48-b79f-a72b902cce8e&source_detail=WDM11%2F01+January+2020) |
| [**WDM11/01** June 2019 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2019-june-wdm11-01/#q-4) | **Q4** Critical path analysis - Edexcel IAL D1 2019 Jun Q4 | FRQ | 4 of 5 parts ((b), (c), (d), (e)) | 10 of 12 on the paper | Medium | [Go to Practice Hub](https://www.examsci.com/practice?set_id=015134b0-982e-4d20-9d99-439657752b32&question_id=3cdc233d-37cc-4430-9609-7fcd00f53d1f&source_detail=WDM11%2F01+June+2019) |
| [**WDM11/01** June 2019 · Edexcel IAL](https://www.examsci.com/past-papers/edexcel-ial/mathematics/decision-mathematics-1-wdm11/2019-june-wdm11-01/#q-6) | **Q6** Critical path analysis - Edexcel IAL D1 2019 Jun Q6 | FRQ | 2 of 3 parts ((b), (c)) | 3 of 8 on the paper | Medium | [Go to Practice Hub](https://www.examsci.com/practice?set_id=015134b0-982e-4d20-9d99-439657752b32&question_id=ec8eaa72-ba9a-4881-bb03-a1767bdde1d2&source_detail=WDM11%2F01+June+2019) |

## Related topic questions in Critical path analysis

- [4.1 Modelling of a project by an activity network, from a precedence table.](https://www.examsci.com/topics/edexcel-ial/mathematics/decision-mathematics-1-wdm11/critical-path-analysis/4-1-modelling-of-a-project-by-an-activity-network-from-a-precedence-table/) — 14 question items · 12 papers — 61 marks · 2019–2026
- [4.2 Completion of the precedence table for a given activity network.](https://www.examsci.com/topics/edexcel-ial/mathematics/decision-mathematics-1-wdm11/critical-path-analysis/4-2-completion-of-the-precedence-table-for-a-given-activity-network/) — 4 question items · 4 papers — 10 marks · 2021–2026
- [4.4 Total float. Gantt (cascade) charts. Scheduling.](https://www.examsci.com/topics/edexcel-ial/mathematics/decision-mathematics-1-wdm11/critical-path-analysis/4-4-total-float-gantt-cascade-charts-scheduling/) — 43 question items · 15 papers — 114 marks · 2020–2026

## Topic question rules and edge cases

**How many topic questions cover this syllabus point?**

25 question stems cover this subtopic across 16 papers, but only 41 tagged parts and 98 marks belong to it. Other parts of the same questions are assessed under different statements and are excluded from this page.

**Which papers include this subtopic?**

The table lists every matching session from 2019–2026. Each row links to the question anchor on the paper page, where the full paper context and practice entry point are available.

**Why can one question appear under several subtopics?**

The parts of one question can assess different syllabus statements. Each part is counted under its own subtopics, so the same question stem can appear on several subtopic pages while each page lists only the parts and marks tagged to that statement.

**Can I practise these questions with AI marking?**

Yes. Open a paper from the table and use the Interactive Practice Hub entry point. The page itself is static HTML so search engines and retrieval agents can read the full question list without executing JavaScript.

---